Kontaktledning Overtemperaturkontroll (BLIX)

EH-KTL-0000-09

60 måneders intervall

Aktivitetsnummer: 1000

Oppgavebeskrivelse

Termografering av ledninger: Påse at ledninger er fri for skader og i orden.

Kommentar

With the AT system, it is not possible to section/isolate the catenary, it is possible to with breakers in the CP from the TPS system. So instead of directly disconnecting the OCL, an option is to disconnect the positive feeder and this way disconnect the catenary.

Dokumentreferanse

UFB-30-Q-65505 The Follo Line Project, EPC TBM. FMECA Report for the OCL
  • Intervall 60 md
  • Myndighetsnivå Lav
  • Type FV TK-M