• Skip to main content
  • Skip to footer
Bane NOR Network Statement - Home page
  • Network Statement 2026
  • Agreement on track access and use of services (AST)
  • Network Statement 2027
  • Archive
  • Network Statement 2028
  • Service Facilities External link
  • Annexes
  • Glossary
  • Bane NOR External link
  • Flere oppslagsverk
  • Norsk
  • English
  1. Network Statement
  2. Automatic train control systems
Choose how you want to display content
Page width
Text
  • Skip to main content

Annexes 2026

  1. Line maps
  2. Connecting railway networks
  3. International loading gauge
  4. Multipurpose wagon gauge
  5. Axle load
  6. Metre weight
  7. Line gradients
  8. Line speed
  9. Electrified lines
  10. Communication systems
  11. Automatic train control systems
  12. Communication for ERTMS
  13. Tunnels
  14. Agreement on track access and use of services (ATS)
  15. Application for capacity and services in service facilities
  16. Method for socio-economic valuation of train path allocation
  17. Access to freight terminals
  18. Oslo Economics (2022) "Segments in passenger and freight traffic on Norwegian railways"
  19. Basic charge
  20. Mark-ups
  1. Line maps
  2. Connecting railway networks
  3. International loading gauge
  4. Multipurpose wagon gauge
  5. Axle load
  6. Metre weight
  7. Line gradients
  8. Line speed
  9. Electrified lines
  10. Communication systems
  11. Automatic train control systems
  12. Communication for ERTMS
  13. Tunnels
  14. Agreement on track access and use of services (ATS)
  15. Application for capacity and services in service facilities
  16. Method for socio-economic valuation of train path allocation
  17. Access to freight terminals
  18. Oslo Economics (2022) "Segments in passenger and freight traffic on Norwegian railways"
  19. Basic charge
  20. Mark-ups

Automatic train control systems

This annex proved an overview of the sections on the Norwegian railway network with automatic train control systems.

Ilustrative overview of the types of security and speed control systems along the rail network.
Illustration: Bane NOR

Download

  • 28052025_Line map signal
    (PDF 630.7 KB )
Bane NOR

Bane NOR

  • Bane NOR SF External link

About the site

  • Privacy statement External link
  • About Network Statement

Contact information

  • Therese Nyberg Borkenhagen
  • +47 457 70 444
  • network.statement@banenor.no Opens default email client