Change log 2027

3.4.1 Rolling stock acceptance

Changes on page: 3 Access Conditions

  • Valid from
  • Edition
  • Published

New chapter 3.4.1.2 – Railway undertakings’ responsibilities for implementing ERA Change Requests on lines with ERTMS Baseline 3

 

Through Norwegian and European railway legislation (ref. TSI CCS), Bane NOR is required to communicate the requirements to be imposed on railway undertakings to ensure that they implement changes/corrections to the ERTMS specifications that may affect interoperability between rolling stock and railway infrastructure.

 

The Notified Body (NoBo) has required Bane NOR to communicate this in the Network Statement, and it will be a prerequisite for obtaining authorisation to bring upcoming ERTMS lines in Norway into operation.

4.5.1.9 Schedule for the annual capacity allocation process

Changes on page: 4 Capacity Allocation

  • Valid from
  • Edition
  • Published

Date for determination of international traffic has been corrected from 24.04. to 24.08. The description has also been altered, from "Final date for detemination of" to "Determination of", as there is only one date for determination of international traffic. 

4.3.2.5 Criteria for re-routing in the event of major impact TCRs and  4.3.2.6 Preliminary plan for remaining capacity for high‑impact TCR

Changes on page: 4 Capacity Allocation

  • Published

Text has been updated following a consultation with the railway undertakings and other interested parties. Contact Bane NOR for more details. 

5.5.1 Other services

Changes on page: 5 Services and Charges

  • Edition
  • Published

Introductory text about other services was incorrect, and has been replaced with original text.