Ventiler, filter, vannmåler (BLIX)
KU-BRO-0000-21
3 måneders intervall
Oppgave | Oppgavebeskrivelse | Lang-beskrivelse | Intervall | Myndighetsnivå | Type FV |
---|---|---|---|---|---|
1000 | Påse at strømningsmåler/vannmåler fungerer og er i orden, ved å undersøke om den oppnår foreskrevet verdi. |
Dok.ref: According to UFB-30-Q-65502 The Follo Line Project, EPC TBM. FMECA Report for the Fire Water System ¿[R3]: - Section 5.2. Overview of preventive maintenance activities with optimized intervals. - Section 6. FMECA (RESULT): o 12.1 Flow meter Kommentar: Proposed routine and intervals as a result of workshop 18.06.21. To be performed the same time as fire water system is tested. Interval after the first year must be adjusted according to experience.
|
3 md | Lav | TK-F |
Oppgave: 1000
Oppgavebeskrivelse
Påse at strømningsmåler/vannmåler fungerer og er i orden, ved å undersøke om den oppnår foreskrevet verdi.Lang-beskrivelse
Dok.ref: According to UFB-30-Q-65502 The Follo Line Project, EPC TBM.FMECA Report for the Fire Water System ¿[R3]:
- Section 5.2. Overview of preventive maintenance activities with
optimized intervals.
- Section 6. FMECA (RESULT):
o 12.1 Flow meter
Kommentar: Proposed routine and intervals as a result of workshop 18.06.21.
Kommentar: Proposed routine and intervals as a result of workshop 18.06.21.
To be performed the same time as fire water system is tested. Interval after the first year must be adjusted according to experience.
- Intervall 3 md
- Myndighetsnivå Lav
- Type FV TK-F
12 måneders intervall
Oppgave | Oppgavebeskrivelse | Lang-beskrivelse | Intervall | Myndighetsnivå | Type FV |
---|---|---|---|---|---|
1010 | Påse at filter og siler, som er tilgjengelige, er fri for skitt, skader og lekkasjer. Filter byttes, og siler rengjøres, ved behov. |
Dok.ref: According to UFB-30-Q-65502 The Follo Line Project, EPC TBM. FMECA Report for the Fire Water System ¿[R3]: - Section 5.2. Overview of preventive maintenance activities with optimized intervals. - Section 6. FMECA (RESULT): o 9.1 and 9.2 Filters and strainers Kommentar: Proposed routine as a result of workshop 18.06.21. Proposed interval from designer. If installation has not been used then inspection shall be performed every 12 months.
|
12 md | Lav | TK-V |
Oppgave: 1010
Oppgavebeskrivelse
Påse at filter og siler, som er tilgjengelige, er fri for skitt, skader og lekkasjer. Filter byttes, og siler rengjøres, ved behov.Lang-beskrivelse
Dok.ref: According to UFB-30-Q-65502 The Follo Line Project, EPC TBM.FMECA Report for the Fire Water System ¿[R3]:
- Section 5.2. Overview of preventive maintenance activities with
optimized intervals.
- Section 6. FMECA (RESULT):
o 9.1 and 9.2 Filters and strainers
Kommentar: Proposed routine as a result of workshop 18.06.21. Proposed interval from designer.
Kommentar: Proposed routine as a result of workshop 18.06.21. Proposed interval from designer.
If installation has not been used then inspection shall be performed every 12 months.
- Intervall 12 md
- Myndighetsnivå Lav
- Type FV TK-V
24 måneders intervall
Oppgave | Oppgavebeskrivelse | Lang-beskrivelse | Intervall | Myndighetsnivå | Type FV |
---|---|---|---|---|---|
1020 | Kalibreringstest av strømingsmåler/vannmåler. |
Dok.ref: According to UFB-30-Q-65502 The Follo Line Project, EPC TBM. FMECA Report for the Fire Water System ¿[R3]: - Section 5.2. Overview of preventive maintenance activities with optimized intervals. - Section 6. FMECA (RESULT): o 12.1 Flow meter
Kommentar: Proposed routine and interval as a result of workshop 18.06.21. |
24 md | Lav | TK-F |
Oppgave: 1020
Oppgavebeskrivelse
Kalibreringstest av strømingsmåler/vannmåler.Lang-beskrivelse
Dok.ref: According to UFB-30-Q-65502 The Follo Line Project, EPC TBM.FMECA Report for the Fire Water System ¿[R3]:
- Section 5.2. Overview of preventive maintenance activities with
optimized intervals.
- Section 6. FMECA (RESULT):
o 12.1 Flow meter
Kommentar:
Proposed routine and interval as a result of workshop 18.06.21.
Kommentar:
Proposed routine and interval as a result of workshop 18.06.21.
- Intervall 24 md
- Myndighetsnivå Lav
- Type FV TK-F
36 måneders intervall
Oppgave | Oppgavebeskrivelse | Lang-beskrivelse | Intervall | Myndighetsnivå | Type FV |
---|---|---|---|---|---|
1030 | Demonter lokket på tilbakeslagsventilen og påse at komponentene og tetningssystemet (obturator; arm, pakkboks og aksel) er fri for slitasje og skader. Rengjør tetningsfunksjon ved behov. |
Dok.ref: Operation Manual Swing Check Valve Supra - UFB-30-A- 65536 Follobanen, Blixtunnelen og Åsland, Elektro lavspenning, Brannsikkerhetssystemer, FDV brukerhåndbok, Km 2,050 – 22,384 ¿[R6] According to UFB-30-Q-65502 The Follo Line Project, EPC TBM. FMECA Report for the Fire Water System ¿[R3]: - Section 5.2. Overview of preventive maintenance activities with optimized intervals.
Kommentar: Proposed interval in review meeting with Company 07.12.21. |
36 md | Lav | PO |
Oppgave: 1030
Oppgavebeskrivelse
Demonter lokket på tilbakeslagsventilen og påse at komponentene og tetningssystemet (obturator; arm, pakkboks og aksel) er fri for slitasje og skader. Rengjør tetningsfunksjon ved behov.Lang-beskrivelse
Dok.ref: Operation Manual Swing Check Valve Supra - UFB-30-A-65536 Follobanen, Blixtunnelen og Åsland, Elektro lavspenning,
Brannsikkerhetssystemer, FDV brukerhåndbok, Km 2,050 –
22,384 ¿[R6]
According to UFB-30-Q-65502 The Follo Line Project, EPC TBM.
FMECA Report for the Fire Water System ¿[R3]:
- Section 5.2. Overview of preventive maintenance activities with
optimized intervals.
Kommentar: Proposed interval in review meeting with Company 07.12.21.
Kommentar: Proposed interval in review meeting with Company 07.12.21.
- Intervall 36 md
- Myndighetsnivå Lav
- Type FV PO