Inspeksjon av kummer - hydrologkontroll (BLIX)
KU-KUM-0000-04
12 måneders intervall
Aktivitetsnummer: 1000
Oppgavebeskrivelse
Mål pH-verdien og konduktivitet i kummer. Vurder behov for justering av mengde tabletter og intervall i samråd med hydrologKommentar
Dok.ref:Specific areas should be detailed when new information is available, but the areas identified so far are:
- Manholes in CP Km 4.1450, CP Km 10.6620, CP Km 11.1420, CP Km 12.3550, CP Km 12.8350, CP Km 13.3150, CP Km 18.1150 and CP Km 19.0750.
According to UFB-30-Q-65503_rev.01E The Follo Line project, EPC TBM. FMECA report for the Drainage System ¿[R4]:
- Section 5.3. Overview of preventive maintenance activities with
optimized intervals.Kommentar:
Maintenance shall be performed according to list of less critical and more critical areas. A preliminary list of less critical and more critical areas can be found in the FMECA report. Maintenance routine and interval cannot be finalized until the results from the flushing process and testing of tablets for the drainage system are ready.
- Intervall 12 md
- Myndighetsnivå Lav
- Type FV TK-M
Aktivitetsnummer: 1010
Oppgavebeskrivelse
'Vurder behov for justering av mengde Baypure-tabletter som skal diseres og intervall mellom hver dosering i samråde med hydrolog- Intervall 12 md
- Myndighetsnivå Lav
- Type FV TK-VE