CoreShield Infrastructure i CoreShield CSF kabinett ERTMS

SA-RAC-0000-03

1 måneders intervall

Oppgave Oppgavebeskrivelse Lang-beskrivelse Intervall Myndighetsnivå Type FV
1000 Checking of LEDs: Genucrypt S Genucrypt S: "Power" and "VPN / Event" should be steady green. "Error" LED should be dark.
See doc. 2000000379 "Maintenance Instructions CoreShield Central System Functions" chapter 6.3 "Checking of LEDs" on page 43 for procedure.
1 md Lav TK-V
1010 Checking of LEDs: HPE ProLiant server "Power" and "Health" LEDs should be steady green. "NIC status" LED should be steady or flashing green.
See doc. 2000000379 "Maintenance Instructions CoreShield Central System Functions" chapter 6.3 "Checking of LEDs" on page 43 for procedure.
1 md Lav TK-V
1020 System backup execution of Sinec NMS database Check that the system performs backups as configured.
See doc. 2000008814 "Operating and Service Manual Communication Network Element Manager" chapter 6.3.3 "CSystem backup execution of Sinec NMS database" on page 43 for procedure.
1 md Lav TK-V

Oppgave: 1000

Oppgavebeskrivelse

Checking of LEDs: Genucrypt S

Lang-beskrivelse

Genucrypt S: "Power" and "VPN / Event" should be steady green. "Error" LED should be dark.
See doc. 2000000379 "Maintenance Instructions CoreShield Central System Functions" chapter 6.3 "Checking of LEDs" on page 43 for procedure.
  • Intervall 1 md
  • Myndighetsnivå Lav
  • Type FV TK-V

Oppgave: 1010

Oppgavebeskrivelse

Checking of LEDs: HPE ProLiant server

Lang-beskrivelse

"Power" and "Health" LEDs should be steady green. "NIC status" LED should be steady or flashing green.
See doc. 2000000379 "Maintenance Instructions CoreShield Central System Functions" chapter 6.3 "Checking of LEDs" on page 43 for procedure.
  • Intervall 1 md
  • Myndighetsnivå Lav
  • Type FV TK-V

Oppgave: 1020

Oppgavebeskrivelse

System backup execution of Sinec NMS database

Lang-beskrivelse

Check that the system performs backups as configured.
See doc. 2000008814 "Operating and Service Manual Communication Network Element Manager" chapter 6.3.3 "CSystem backup execution of Sinec NMS database" on page 43 for procedure.
  • Intervall 1 md
  • Myndighetsnivå Lav
  • Type FV TK-V

12 måneders intervall

Oppgave Oppgavebeskrivelse Lang-beskrivelse Intervall Myndighetsnivå Type FV
1030 Visual inspection of the cleanliness of computer cabinet and components Check whether the cabinet and its components are clean and undamaged.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.1 "Visual inspection of the cleanliness of computer cabinet and components" på side 67 for prosedyre.
12 md Høy TK-V
1040 Functional test of computer cabinet doors Check whether the cabinet doors close easily and tightly.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.2 "Functional test of computer cabinet doors" på side 67 for prosedyre.
12 md Høy TK-F
1050 Visual inspection of cables and connectors 1) Check whether the earthing cables are connected from the cabinet doors to the cabinet frame.
2) Check whether the earthing cable of the cabinet is fixed and not torn off.
3) Check whether the contact clips and cable straps are fixed properly.
4) Check whether the incoming and outgoing cables are laid and fixed properly.
5) Check whether all connectors are plugged in properly, fixed and labeled.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.3 "Visual inspection of cables and connectors" på side 68 for prosedyre.
12 md Lav TK-V
1060 Visual inspection of CoolBlastT 230V HP fan assembly 1) Check whether the fan assembly is operational: the green LED “system ok” on the front of the fan must light up.
2) Check that the fan speed operates in the required range: the red LED on the front of the fan is off.
3) Check whether the fan assembly is making unusual noises.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.3 "Visual inspection of CoolBlastT 230V HP fan assembly" på side 68 for prosedyre.
12 md Lav TK-V
1070 Visual inspection of AC115-230V/DC24V fan assembly 1) Check whether the fan assembly is operational: the green LED on the front of the fan must light up.
2) Check that the fan speed operates in the required range: the red LED on the front of the fan is off.
3) Check whether the fan assembly is making unusual noises.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.3 "Visual inspection of cables and connectors" på side 69 for prosedyre.
12 md Lav TK-V
1080 Functional test of AC115-230V/DC24V fan assembly Press the blue button. The red LED must light up.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.3 "Functional test of AC115-230V/DC24V fan assembly" på side 70 for prosedyre.
12 md Høy TK-F

Oppgave: 1030

Oppgavebeskrivelse

Visual inspection of the cleanliness of computer cabinet and components

Lang-beskrivelse

Check whether the cabinet and its components are clean and undamaged.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.1 "Visual inspection of the cleanliness of computer cabinet and components" på side 67 for prosedyre.
  • Intervall 12 md
  • Myndighetsnivå Høy
  • Type FV TK-V

Oppgave: 1040

Oppgavebeskrivelse

Functional test of computer cabinet doors

Lang-beskrivelse

Check whether the cabinet doors close easily and tightly.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.2 "Functional test of computer cabinet doors" på side 67 for prosedyre.
  • Intervall 12 md
  • Myndighetsnivå Høy
  • Type FV TK-F

Oppgave: 1050

Oppgavebeskrivelse

Visual inspection of cables and connectors

Lang-beskrivelse

1) Check whether the earthing cables are connected from the cabinet doors to the cabinet frame.
2) Check whether the earthing cable of the cabinet is fixed and not torn off.
3) Check whether the contact clips and cable straps are fixed properly.
4) Check whether the incoming and outgoing cables are laid and fixed properly.
5) Check whether all connectors are plugged in properly, fixed and labeled.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.3 "Visual inspection of cables and connectors" på side 68 for prosedyre.
  • Intervall 12 md
  • Myndighetsnivå Lav
  • Type FV TK-V

Oppgave: 1060

Oppgavebeskrivelse

Visual inspection of CoolBlastT 230V HP fan assembly

Lang-beskrivelse

1) Check whether the fan assembly is operational: the green LED “system ok” on the front of the fan must light up.
2) Check that the fan speed operates in the required range: the red LED on the front of the fan is off.
3) Check whether the fan assembly is making unusual noises.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.3 "Visual inspection of CoolBlastT 230V HP fan assembly" på side 68 for prosedyre.
  • Intervall 12 md
  • Myndighetsnivå Lav
  • Type FV TK-V

Oppgave: 1070

Oppgavebeskrivelse

Visual inspection of AC115-230V/DC24V fan assembly

Lang-beskrivelse

1) Check whether the fan assembly is operational: the green LED on the front of the fan must light up.
2) Check that the fan speed operates in the required range: the red LED on the front of the fan is off.
3) Check whether the fan assembly is making unusual noises.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.3 "Visual inspection of cables and connectors" på side 69 for prosedyre.
  • Intervall 12 md
  • Myndighetsnivå Lav
  • Type FV TK-V

Oppgave: 1080

Oppgavebeskrivelse

Functional test of AC115-230V/DC24V fan assembly

Lang-beskrivelse

Press the blue button. The red LED must light up.
Se dok. 2000006700 "Operating and Service Manual Generic
Master CCF Cabinets" kap 8.3.3 "Functional test of AC115-230V/DC24V fan assembly" på side 70 for prosedyre.
  • Intervall 12 md
  • Myndighetsnivå Høy
  • Type FV TK-F