Batteri (18kVA, 54kVA, 108kVA) (SKI)
EL-BAT-0000-08
6 måneders intervall
| Oppgave | Oppgavebeskrivelse | Lang beskrivelse | Dokumentreferanse | Intervall | Myndighetsnivå | Type FV |
|---|---|---|---|---|---|---|
| 1000 | Påse at batteri er fulladet. |
System control and adjustment Calibration of AC and DC output voltage: Check that the AC and DC voltages are correct. If they deviate more than + - 1% - calibrate this value. AC and DC load anbad battery power control: Measure with an ampere meter that all currents are correct on the display in relation to the measured value. If the measured value deviates more than + - 2% from what the display shows - calibrate this value. DC output voltage control: Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value. Alarm relay test: Connect the PC and run the alarm relay output test to check all the alarm relays. For the battery bank check: The LI-Ion battery will run this control even via BSM Manual bypass function: Follow the procedure for manual bypass switch and enable / disable bypass switch
|
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D | 6 md | Lav | TK-M |
| 1010 | Påse at batterisystemet er rent, i orden, fri for skader og slitasje. |
System control and adjustment Calibration of AC and DC output voltage: Check that the AC and DC voltages are correct. If they deviate more than + - 1% - calibrate this value. AC and DC load anbad battery power control: Measure with an ampere meter that all currents are correct on the display in relation to the measured value. If the measured value deviates more than + - 2% from what the display shows - calibrate this value. DC output voltage control: Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value. Alarm relay test: Connect the PC and run the alarm relay output test to check all the alarm relays. For the battery bank check: The LI-Ion battery will run this control even via BSM Manual bypass function: Follow the procedure for manual bypass switch and enable / disable bypass switch
|
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D | 6 md | Lav | TK-V |
| 1020 | Påse at koblingene til batteribanken er ordentlig tilskrudd, og at batteriene og batteripolene er fri for lekkasjer. |
System control and adjustment Calibration of AC and DC output voltage: Check that the AC and DC voltages are correct. If they deviate more than + - 1% - calibrate this value. AC and DC load anbad battery power control: Measure with an ampere meter that all currents are correct on the display in relation to the measured value. If the measured value deviates more than + - 2% from what the display shows - calibrate this value. DC output voltage control: Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value. Alarm relay test: Connect the PC and run the alarm relay output test to check all the alarm relays. For the battery bank check: The LI-Ion battery will run this control even via BSM Manual bypass function: Follow the procedure for manual bypass switch and enable / disable bypass switch
|
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D | 6 md | Lav | TK-V |
| 1030 | Påse at batteribanken fungerer som den skal, ved å gjøre en batteriutladningstest. |
System control and adjustment Calibration of AC and DC output voltage: Check that the AC and DC voltages are correct. If they deviate more than + - 1% - calibrate this value. AC and DC load anbad battery power control: Measure with an ampere meter that all currents are correct on the display in relation to the measured value. If the measured value deviates more than + - 2% from what the display shows - calibrate this value. DC output voltage control: Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value. Alarm relay test: Connect the PC and run the alarm relay output test to check all the alarm relays. For the battery bank check: The LI-Ion battery will run this control even via BSM Manual bypass function: Follow the procedure for manual bypass switch and enable / disable bypass switch
|
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D | 6 md | Lav | TK-F |
| 1040 | Påse at kabler, koblinger og fordelingsskinner har god kontakt. |
System control and adjustment Calibration of AC and DC output voltage: Check that the AC and DC voltages are correct. If they deviate more than + - 1% - calibrate this value. AC and DC load anbad battery power control: Measure with an ampere meter that all currents are correct on the display in relation to the measured value. If the measured value deviates more than + - 2% from what the display shows - calibrate this value. DC output voltage control: Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value. Alarm relay test: Connect the PC and run the alarm relay output test to check all the alarm relays. For the battery bank check: The LI-Ion battery will run this control even via BSM Manual bypass function: Follow the procedure for manual bypass switch and enable / disable bypass switch
|
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D | 6 md | Lav | TK-V |
Oppgave: 1000
Oppgavebeskrivelse
Påse at batteri er fulladet.Lang beskrivelse
System control and adjustment
Calibration of AC and DC output voltage:
Check that the AC and DC voltages are correct.
If they deviate more than + - 1% - calibrate this value.
AC and DC load anbad battery power control:
Measure with an ampere meter that all currents are correct on the display in relation to the measured value.
If the measured value deviates more than + - 2% from what the display shows - calibrate this value.
DC output voltage control:
Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value.
Alarm relay test:
Connect the PC and run the alarm relay output test to check all the alarm relays.
For the battery bank check: The LI-Ion battery will run this control even via BSM
Manual bypass function:
Follow the procedure for manual bypass switch and enable / disable bypass switch
Dokumentreferanse
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D- Intervall 6 md
- Myndighetsnivå Lav
- Type FV TK-M
Oppgave: 1010
Oppgavebeskrivelse
Påse at batterisystemet er rent, i orden, fri for skader og slitasje.Lang beskrivelse
System control and adjustment
Calibration of AC and DC output voltage:
Check that the AC and DC voltages are correct.
If they deviate more than + - 1% - calibrate this value.
AC and DC load anbad battery power control:
Measure with an ampere meter that all currents are correct on the display in relation to the measured value.
If the measured value deviates more than + - 2% from what the display shows - calibrate this value.
DC output voltage control:
Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value.
Alarm relay test:
Connect the PC and run the alarm relay output test to check all the alarm relays.
For the battery bank check: The LI-Ion battery will run this control even via BSM
Manual bypass function:
Follow the procedure for manual bypass switch and enable / disable bypass switch
Dokumentreferanse
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D- Intervall 6 md
- Myndighetsnivå Lav
- Type FV TK-V
Oppgave: 1020
Oppgavebeskrivelse
Påse at koblingene til batteribanken er ordentlig tilskrudd, og at batteriene og batteripolene er fri for lekkasjer.Lang beskrivelse
System control and adjustment
Calibration of AC and DC output voltage:
Check that the AC and DC voltages are correct.
If they deviate more than + - 1% - calibrate this value.
AC and DC load anbad battery power control:
Measure with an ampere meter that all currents are correct on the display in relation to the measured value.
If the measured value deviates more than + - 2% from what the display shows - calibrate this value.
DC output voltage control:
Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value.
Alarm relay test:
Connect the PC and run the alarm relay output test to check all the alarm relays.
For the battery bank check: The LI-Ion battery will run this control even via BSM
Manual bypass function:
Follow the procedure for manual bypass switch and enable / disable bypass switch
Dokumentreferanse
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D- Intervall 6 md
- Myndighetsnivå Lav
- Type FV TK-V
Oppgave: 1030
Oppgavebeskrivelse
Påse at batteribanken fungerer som den skal, ved å gjøre en batteriutladningstest.Lang beskrivelse
System control and adjustment
Calibration of AC and DC output voltage:
Check that the AC and DC voltages are correct.
If they deviate more than + - 1% - calibrate this value.
AC and DC load anbad battery power control:
Measure with an ampere meter that all currents are correct on the display in relation to the measured value.
If the measured value deviates more than + - 2% from what the display shows - calibrate this value.
DC output voltage control:
Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value.
Alarm relay test:
Connect the PC and run the alarm relay output test to check all the alarm relays.
For the battery bank check: The LI-Ion battery will run this control even via BSM
Manual bypass function:
Follow the procedure for manual bypass switch and enable / disable bypass switch
Dokumentreferanse
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D- Intervall 6 md
- Myndighetsnivå Lav
- Type FV TK-F
Oppgave: 1040
Oppgavebeskrivelse
Påse at kabler, koblinger og fordelingsskinner har god kontakt.Lang beskrivelse
System control and adjustment
Calibration of AC and DC output voltage:
Check that the AC and DC voltages are correct.
If they deviate more than + - 1% - calibrate this value.
AC and DC load anbad battery power control:
Measure with an ampere meter that all currents are correct on the display in relation to the measured value.
If the measured value deviates more than + - 2% from what the display shows - calibrate this value.
DC output voltage control:
Measure the DC voltage on the DC distribution with a little load connected. If this voltage on the display deviates more than 1% from the measured value - calibrate this value.
Alarm relay test:
Connect the PC and run the alarm relay output test to check all the alarm relays.
For the battery bank check: The LI-Ion battery will run this control even via BSM
Manual bypass function:
Follow the procedure for manual bypass switch and enable / disable bypass switch
Dokumentreferanse
Østfoldbanen V L (Oslo S) - Ski, Ski Stasjon, UOS-90-A-56106_01D, UOS-90-A-56108_01D, UOS-90-A-56118_01D, UOS-90-A-56126_01D- Intervall 6 md
- Myndighetsnivå Lav
- Type FV TK-V