Kontaktledning visuell (BLIX)
EH-KTL-0000-08
1 måneders intervall
| Oppgave | Oppgavebeskrivelse | Lang beskrivelse | Dokumentreferanse | Intervall | Myndighetsnivå | Type FV |
|---|---|---|---|---|---|---|
| 1000 | Påse at kontaktledningen er fri for skader og i orden ved 7km/t. | At the beginning, monthly inspections of the contact wire to detect scaling and dripping. Later on, this monthly interwal might be longer based on the return of experience | UFB-30-Q-65505 The Follo Line Project, EPC TBM. FMECA Report for the OCL | 1 md | Lav | TK-M |
| 1010 | Påse at kontaktledningen er fri for avskalling | At the beginning, monthly inspections of the contact wire to detect scaling and dripping. Later on, this monthly interwal might be longer based on the return of experience | UFB-30-Q-65505 The Follo Line Project, EPC TBM. FMECA Report for the OCL | 1 md | Lav | TK-V |
Oppgave: 1000
Oppgavebeskrivelse
Påse at kontaktledningen er fri for skader og i orden ved 7km/t.Lang beskrivelse
At the beginning, monthly inspections of the contact wire to detect scaling and dripping. Later on, this monthly interwal might be longer based on the return of experienceDokumentreferanse
UFB-30-Q-65505 The Follo Line Project, EPC TBM. FMECA Report for the OCL- Intervall 1 md
- Myndighetsnivå Lav
- Type FV TK-M
Oppgave: 1010
Oppgavebeskrivelse
Påse at kontaktledningen er fri for avskallingLang beskrivelse
At the beginning, monthly inspections of the contact wire to detect scaling and dripping. Later on, this monthly interwal might be longer based on the return of experienceDokumentreferanse
UFB-30-Q-65505 The Follo Line Project, EPC TBM. FMECA Report for the OCL- Intervall 1 md
- Myndighetsnivå Lav
- Type FV TK-V