Kontaktledning visuell (BLIX)
EH-KTL-0000-08
1 måneders intervall
Oppgave | Oppgavebeskrivelse | Lang-beskrivelse | Dokumentreferanse | Intervall | Myndighetsnivå | Type FV |
---|---|---|---|---|---|---|
1000 | Påse at kontaktledningen er fri for skader og i orden ved 7km/t. | At the beginning, monthly inspections of the contact wire to detect scaling and dripping. Later on, this monthly interwal might be longer based on the return of experience | UFB-30-Q-65505 The Follo Line Project, EPC TBM. FMECA Report for the OCL | 1 md | Lav | TK-M |
1010 | Påse at kontaktledningen er fri for avskalling | At the beginning, monthly inspections of the contact wire to detect scaling and dripping. Later on, this monthly interwal might be longer based on the return of experience | UFB-30-Q-65505 The Follo Line Project, EPC TBM. FMECA Report for the OCL | 1 md | Lav | TK-V |
Oppgave: 1000
Oppgavebeskrivelse
Påse at kontaktledningen er fri for skader og i orden ved 7km/t.Lang-beskrivelse
At the beginning, monthly inspections of the contact wire to detect scaling and dripping. Later on, this monthly interwal might be longer based on the return of experienceDokumentreferanse
UFB-30-Q-65505 The Follo Line Project, EPC TBM. FMECA Report for the OCL- Intervall 1 md
- Myndighetsnivå Lav
- Type FV TK-M
Oppgave: 1010
Oppgavebeskrivelse
Påse at kontaktledningen er fri for avskallingLang-beskrivelse
At the beginning, monthly inspections of the contact wire to detect scaling and dripping. Later on, this monthly interwal might be longer based on the return of experienceDokumentreferanse
UFB-30-Q-65505 The Follo Line Project, EPC TBM. FMECA Report for the OCL- Intervall 1 md
- Myndighetsnivå Lav
- Type FV TK-V