Applicable version for timetable period TT26. 

Change Log 2026

Overview of major changes in Network Statement 2026.

4.5.1.4 Permanent capacity changes

Changes on page: 4 Capacity Allocation

  • Valid from
  • Edition
  • Published

"Stavne–Leangenbanen: Electrification" has been added to New infrastructure, capacity enhancements. 

4.2.8 Annual capacity allocation and Figure 1

Changes on page: 4 Capacity Allocation

  • Valid from
  • Edition
  • Published

Table 5 has been updated: Implementation phase has been changed to Allocation phase. Following this, Figure 1 has been changed as well. 

4.2.9 Operational capacity allocation

Changes on page: 4 Capacity Allocation

  • Valid from
  • Edition
  • Published

Table 6: How to apply for residual capacity has been moved from Chapter  4.2.9.1 Non-compliance with production-related planning requirements to Chapter 4.2.9 Operational capacity allocation. 

Furthermore, the following clarification has been added to the table: Note that applications for residual capacity within the same day of operations only applies to operational critical needs. For further details, see Chapter 4.5.3.

4.2.8 Annual capacity allocation

Changes on page: 4 Capacity Allocation

  • Valid from
  • Edition
  • Published

Table 5 has been updated. 

4.2.9 Operational capacity allocation and 4.5.3. Ad hoc path requests

Changes on page: 4 Capacity Allocation

  • Valid from
  • Edition
  • Published

E-mail address rol@banenor.no has been replaced with nok@banenor.no.

4.2.9 Operational capacity allocation and 4.5.3 Ad-hoc path requests

Changes on page: 4 Capacity Allocation

  • Valid from
  • Edition
  • Published

The e-mail address rol@banenor.no has been replacd by nok@banenor.no.

4.6.3 Prioritisation criteria (in the event of congested infrastructure)

Changes on page: 4 Capacity Allocation

  • Published

Pursuant to the consultation (22 November–8 November 2024), the assessment of socio-economic value in accordance with § 9-5 (2) of the Railway Regulations has been revised. 

6.3.2.1 The train controller’s right to depart from the operational guidelines due to local conditions

Changes on page: 6 Operations

  • Valid from
  • Edition
  • Published

Text has been updated following the removal of the train controller's limitations to deviate from the rules.

7.3.4 Marshalling yards and train formation facilities, including shunting facilities

Changes on page: 7 Service Facilities

  • Valid from
  • Edition
  • Published

Table 6: Railway undertakings that offer shunting at various locations and the list of the undertakings' websites, has been updated. 

7.3.1.1 Access to service facilities and associated services

Changes on page: 7 Service Facilities

  • Valid from
  • Edition
  • Published

References to relevant chapters in Part 4 Capacity Allocation have been added. 

7.3.6 Service facilities

Changes on page: 7 Service Facilities

  • Valid from
  • Edition
  • Published

Text in Chapters 7.3.6.1 General information and 7.3.6.6 Capacity allocation have been updated to better reflect the current situation. 

7.3.7 Other technical facilities

Changes on page: 7 Service Facilities

  • Valid from
  • Edition
  • Published

Chapters 7.3.7.2 Services og 7.3.7.4 Charges, including tables have been updated to better reflect the current situation.