Change Log 2026
Overview of major changes in Network Statement 2026.
4.5.1.4 Permanent capacity changes
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
"Stavne–Leangenbanen: Electrification" has been added to New infrastructure, capacity enhancements.
4.2.8 Annual capacity allocation and Figure 1
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
Table 5 has been updated: Implementation phase has been changed to Allocation phase. Following this, Figure 1 has been changed as well.
4.2.9 Operational capacity allocation
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
Table 6: How to apply for residual capacity has been moved from Chapter 4.2.9.1 Non-compliance with production-related planning requirements to Chapter 4.2.9 Operational capacity allocation.
Furthermore, the following clarification has been added to the table: Note that applications for residual capacity within the same day of operations only applies to operational critical needs. For further details, see Chapter 4.5.3.
4.2.8 Annual capacity allocation
4.2.9 Operational capacity allocation and 4.5.3. Ad hoc path requests
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
E-mail address rol@banenor.no has been replaced with nok@banenor.no.
4.2.9 Operational capacity allocation and 4.5.3 Ad-hoc path requests
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
The e-mail address rol@banenor.no has been replacd by nok@banenor.no.
4.6.3 Prioritisation criteria (in the event of congested infrastructure)
Changes on page: 4 Capacity Allocation
- Published
Pursuant to the consultation (22 November–8 November 2024), the assessment of socio-economic value in accordance with § 9-5 (2) of the Railway Regulations has been revised.
6.3.2.1 The train controller’s right to depart from the operational guidelines due to local conditions
Changes on page: 6 Operations
- Valid from
- Edition
- Published
Text has been updated following the removal of the train controller's limitations to deviate from the rules.
7.3.4 Marshalling yards and train formation facilities, including shunting facilities
Changes on page: 7 Service Facilities
- Valid from
- Edition
- Published
Table 6: Railway undertakings that offer shunting at various locations and the list of the undertakings' websites, has been updated.
7.3.1.1 Access to service facilities and associated services
Changes on page: 7 Service Facilities
- Valid from
- Edition
- Published
References to relevant chapters in Part 4 Capacity Allocation have been added.
7.3.6 Service facilities
Changes on page: 7 Service Facilities
- Valid from
- Edition
- Published
Text in Chapters 7.3.6.1 General information and 7.3.6.6 Capacity allocation have been updated to better reflect the current situation.
7.3.7 Other technical facilities
Changes on page: 7 Service Facilities
- Valid from
- Edition
- Published
Chapters 7.3.7.2 Services og 7.3.7.4 Charges, including tables have been updated to better reflect the current situation.