• Skip to main content
  • Skip to footer
Home page Network Statement Home page Network Statement
  • Network Statement 2025
  • Annexes
  • Network Statement 2026
  • Network Statement 2027
  • Agreement on track access and use of services (AST)
  • Infrastructure Opens in a new tab
  • Previous Versions
  • Glossary
  • Bane NOR Opens in a new tab
  • Flere oppslagsverk
  • Norsk
  • English
  1. Network Statement
  2. Relief facilities
  1. 2.2.1 Line maps
  2. 2.2.2.2 Connecting railway networks
  3. 2.3.4.1 International loading gauge
  4. 2.3.4.2 Dynamic gauge
  5. 2.3.4.3 Multipurpose wagon gauge
  6. 2.3.5.1 Axle load
  7. 2.3.5.2 Metre weight
  8. 2.3.6 Line gradients
  9. 2.3.7 Line speed
  10. 2.3.9 Electrified lines
  11. 2.3.11 Traffic control areas
  12. 2.3.12 Communication systems
  13. 2.3.13 Automatic train control systems
  14. 2.3.13.2 Communication for ERTMS
  15. 2.4.2.3.1 Sections vulnerable to landslides
  16. 2.4.2.3.2 Animal collisions
  17. 2.4.4 Tunnels
  18. 3.3.2 Agreement on track access and use of services
  19. 4.2.4.2 Application for capacity and services in service facilities
  20. 4.5.4 Method for socio-economic valuation of train path allocation
  21. 5 Access to freight terminals
  22. 5.2.5 Oslo Economics (2022) "Segments in passenger and freight traffic on Norwegian railways"
  23. 5.3.2.1 Basic charge
  24. 5.3.2.3 Mark-ups
  25. 7.3.9 Relief facilities
  26. 7.3.10 Refuelling facilities

Annexes to Network Statement 2026

  1. 2.2.1 Line maps
  2. 2.2.2.2 Connecting railway networks
  3. 2.3.4.1 International loading gauge
  4. 2.3.4.2 Dynamic gauge
  5. 2.3.4.3 Multipurpose wagon gauge
  6. 2.3.5.1 Axle load
  7. 2.3.5.2 Metre weight
  8. 2.3.6 Line gradients
  9. 2.3.7 Line speed
  10. 2.3.9 Electrified lines
  11. 2.3.11 Traffic control areas
  12. 2.3.12 Communication systems
  13. 2.3.13 Automatic train control systems
  14. 2.3.13.2 Communication for ERTMS
  15. 2.4.2.3.1 Sections vulnerable to landslides
  16. 2.4.2.3.2 Animal collisions
  17. 2.4.4 Tunnels
  18. 3.3.2 Agreement on track access and use of services
  19. 4.2.4.2 Application for capacity and services in service facilities
  20. 4.5.4 Method for socio-economic valuation of train path allocation
  21. 5 Access to freight terminals
  22. 5.2.5 Oslo Economics (2022) "Segments in passenger and freight traffic on Norwegian railways"
  23. 5.3.2.1 Basic charge
  24. 5.3.2.3 Mark-ups
  25. 7.3.9 Relief facilities
  26. 7.3.10 Refuelling facilities

Relief facilities

Published: 5. November 2024 5. Nov 2024

Relief facilities for emergency terminals

Relief facilities may be found in the following locations:

  • Kvam
  • Palmafoss
  • Støren
  • Steinkjer

Bane NOR’s emergency response portal (Beredskapsportalen) contains information on emergency measures. A password is required to log in to the portal. To obtain a password, please email beredskap@banenor.no.

Emergency Response Portal External link

Emergency response information covering alerting protocols, incident handling, communication procedures, and coordination during emergencies.

Bane NOR

  • Bane NOR SF Opens in a new tab

About the site

  • Privacy statement Opens in a new tab
  • About Network Statement

Contact information

  • Therese Nyberg Borkenhagen
  • +47 457 70 444
  • network.statement@banenor.no Opens default email client