Changelog 2025
2.3.11.1 Sections with centralised traffic control
Changes on page: 2 Infrastructure
- Valid from
- Edition
- Published
Due to technical problems, updated text from 2024 was not included in the original publication of Network Statement 2025. The text has now been included.
2.4.4 Tunnels
Changes on page: 2 Infrastructure
- Valid from
- Edition
- Published
Text has been updated to ensure clarity.
4.6.2 Congested lines (in Norway)
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
List of congested lines have been updated.
4.2.8 Annual capacity allocation and Figure 1
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
Table 5 has been updated: Implementation phase has been changed to Allocation phase. Following this, Figure 1 has been changed as well.
4.2.9 Operational capacity allocation
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
Table 6: How to apply for residual capacity has been moved from Chapter 4.2.9.1 Non-compliance with production-related planning requirements to Chapter 4.2.9 Operational capacity allocation.
Furthermore, the following clarification has been added to the table: Note that applications for residual capacity within the same day of operations only applies to operational critical needs. For further details, see Chapter 4.5.3.
4.2.8 Annual capacity allocation
4.2.9 Operational capacity allocation and 4.5.3. Ad hoc path requests
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
E-mail address rol@banenor.no has been replaced with nok@banenor.no.
4.2.5.3 Line numbers
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
Table 2: Line numbers have been updated.
4.5.3. Ad hoc path requests
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
Text concerning applications for residual capacidy during operational hours have been added. This is similar to the text that was first published in Network Statement 2026.
4.6.3 Prioritisation criteria (in the event of congested infrastructure)
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
Text has been updated to reflect Bane NOR's practices during the capacity allocation process for TT24.
4.5.2 Late annual timetable path requests
Changes on page: 4 Capacity Allocation
- Valid from
- Edition
- Published
PCS has been creplaced by Best-L.
4.3.2.2 Schedule for considering TCRs in the phases Long-term Capacity Planning and Annual Capacity Allocation
5.2.5 List of market segments
Changes on page: 5 Services and Charges
- Valid from
- Edition
- Published
The entire chapter has been updated in order to clarify the information about segmentation.
5.3.2.3 Mark-ups on infrastructure charges
Changes on page: 5 Services and Charges
- Valid from
- Edition
- Published
The following segments:
- iron ore and similar transport with low price elasticity
- iron ore and similar transport with higher price elasticity
have been updated to:
- iron ore and similar transport A
- iron ore and similar transport B
Additionally, the note about SJT's notice of decision regarding surcharges have been added.
Update of charges in Part 5
Changes on page: 5 Services and Charges
- Valid from
- Edition
- Published
Charges in the following hapters have been updated accoridng to Statistics Norway's price index. for the operation and mainenance fo road systems.
- 5.3.3 Minimum access package charges
- Table 3: Charges
- Table 4: Example
- Table 5: Example
- 5.4.2.2 Train heating posts
- 5.7.1 Bane NOR's performance scheme
- Table 7: Rates
- Table 8: Market segments and thresholds
- Table 9: Percentage change to charges
5.3.2.3 Mark-ups on infrastructure charges
Changes on page: 5 Services and Charges
- Valid from
- Edition
- Published
The following segments:
- iron ore with low price elasticity
- iron or with higher price elasticity
have been updated to:
- iron ore and similar transport with low price elasticity
- iron ore and similar transport with higher price elasticity
5.3.2.5 The following forms of operation are exempt from infrastructure charges
Changes on page: 5 Services and Charges
- Valid from
- Edition
- Published
The following point has been added:
- operation for non-profit purposes.
5.3.2.1. Charges based on direct costs—basic charge
Changes on page: 5 Services and Charges
- Valid from
- Edition
- Published
Follobanen has been added to Table 1: Division of lines in Norway.
5.2.5 List of market segments and 5.6.4 Penalties for path cancellations
Changes on page: 5 Services and Charges
- Valid from
- Edition
- Published
Text has been updated to improve clarity.
6.3.2.1 The train controller’s right to depart from the operational guidelines due to local conditions
6.3.3.3 Emergency response plan for accidents
Changes on page: 6 Operations
- Valid from
- Edition
- Published
Text updated to correct outdated information.
6.3.3.2 Unforeseen problems
Changes on page: 6 Operations
- Valid from
- Edition
- Published
Text updated to reflect current practice.
6.3.3.2 Unforeseen problems
7.3.3 Freight terminals and 7.3.6 Maintenance facilities
Changes on page: 7 Service Facilities
- Valid from
- Edition
- Published
Table 4, 7, 8, 10, and 11 have been remove in order to improve the information quality. Links to overviews of infrastructure have been added.
Update to charges in Part 7
Changes on page: 7 Service Facilities
- Valid from
- Edition
- Published
Charges in the following hapters have been updated accoridng to Statistics Norway's price index. for the operation and mainenance fo road systems.
- 7.3.2.4 Charges
- Table 2: Charge estimates applied to single-user stations in 2025
- Table 3: Charges applied to multi-user stations in 2025
- 7.3.3.4 Charges
- Table 5: Charges for access to intermodal/rail freight terminals
- Table 6: Charges for access to timber terminals
- 5.3.5.4 Charges
- Table 11: Subscription charges for stabling/parking
- Table 12: Charge per hour per commenced 100 metres of stock in NOK